R11 - Speed, density and other compound units

R11 - Speed, density and other compound units

Use speed, rates of pay, unit prices, density and pressure to connect two measurements. You will choose a calculation from the meaning of “per”, keep units consistent and compare quantities fairly.

Average speed, distance and time

Travel half a journey at 20 km/h20\,\mathrm{km/h} and the other half at 60 km/h60\,\mathrm{km/h}. Is your average speed 40 km/h40\,\mathrm{km/h}? The slower half takes longer, so averaging the two displayed speeds will not work.

You already know

There are 6060 minutes in an hour, so 4545 minutes is 4560=0.75\frac{45}{60}=0.75 hours. R1 covered converting compound units. Convert before combining measurements in a formula.

A compound unit combines units. In km/h\mathrm{km/h}, “per hour” means “for each hour”. A steady 50 km/h50\,\mathrm{km/h} covers 50 km50\,\mathrm{km} in one hour, or 25 km25\,\mathrm{km} in half an hour. Average speed spreads the total distance evenly over the total time, even if the actual speed changes.

Average speed

average speed=total distancetotal timedistance=speed×timetime=distancespeed\begin{aligned} \text{average speed}&=\frac{\text{total distance}}{\text{total time}}\\ \text{distance}&=\text{speed}\times\text{time}\\ \text{time}&=\frac{\text{distance}}{\text{speed}} \end{aligned}

Use matching units. For average speed over several stages, include all distances and all elapsed times, including stops.

Not on the formulae sheet: learn it.

A written total-time calculation makes your choice clear, especially when a journey includes a stop.

Worked example 1: a journey without a stop

Question. A cyclist travels 18 km18\,\mathrm{km} in 4545 minutes. Work out the average speed in km/h\mathrm{km/h}. Non-calculator.

Plan. Convert the time to hours, then divide distance by time.

45÷60=34time in hours18÷34=18×43distance divided by time=24evaluate\begin{aligned} 45\div60&=\frac34 &&\text{time in hours}\\ 18\div\frac34&=18\times\frac43 &&\text{distance divided by time}\\ &=24 &&\text{evaluate} \end{aligned}

Why convert first? Dividing kilometres by minutes gives kilometres per minute, not kilometres per hour.

Answer. 24 km/h24\,\mathrm{km/h}.

Check. 24×34=18 km24\times\frac34=18\,\mathrm{km}.

Add only a 1515-minute stop to the same ride. The distance stays the same, while the total elapsed time increases.

Worked example 2: including a stop

Question. A cyclist rides 18 km18\,\mathrm{km} in 4545 minutes, then rests for 1515 minutes. Work out the average speed over the whole hour, including the rest. Non-calculator.

Plan. Add riding and resting times, then use total distance divided by total time.

45+15=60elapsed minutes60÷60=1elapsed hours18÷1=18average speed\begin{aligned} 45+15&=60 &&\text{elapsed minutes}\\ 60\div60&=1 &&\text{elapsed hours}\\ 18\div1&=18 &&\text{average speed} \end{aligned}

Why include the stop? The question asks about the whole hour. No extra distance is covered during those fifteen minutes.

Answer. 18 km/h18\,\mathrm{km/h}.

Check. A stop must reduce the whole-journey average below the riding average of 24 km/h24\,\mathrm{km/h}.

Now settle the opening puzzle with a 60 km60\,\mathrm{km} journey. The first 30 km30\,\mathrm{km} takes 30÷20=1.530\div20=1.5 hours; the second takes 30÷60=0.530\div60=0.5 hours. The average is 60÷2=30 km/h60\div2=30\,\mathrm{km/h}, not 4040. Surprisingly, equal distances do not give equal importance to the two speeds: three quarters of the time is spent at the slower one.

Watch out

Wrong: (20+60)÷2=40(20+60)\div2=40 for equal-distance stages. Right: divide total distance by total time. The simple mean of two speeds works for two stages of equal duration, not generally for equal distances.

The next ride changes the distance and the rest time. Include both pieces of time.

Rates of pay and unit prices

A pay rate tells you the money for one unit of time; a unit price tells you the money for one unit of a product.

At £12\pounds 12 per hour, three hours earns £36\pounds 36. A £6\pounds 6 pack containing 2 kg2\,\mathrm{kg} costs £3\pounds 3 per kilogram. “Per” tells you which quantity belongs underneath the division.

Pay rates and unit prices

For a fixed hourly rate and no other payments or deductions,

pay=hourly rate×hourshourly rate=payhoursunit price=total pricequantity\begin{aligned} \text{pay}&=\text{hourly rate}\times\text{hours}\\ \text{hourly rate}&=\frac{\text{pay}}{\text{hours}}\\ \text{unit price}&=\frac{\text{total price}}{\text{quantity}} \end{aligned}

Match time units for pay and quantity units for price comparisons.

Not on the formulae sheet: learn it.

Compare rates for the same amount. A larger total payment can simply mean more hours of work.

Worked example 3: comparing hourly pay

Question. Job A pays £52\pounds 52 for 44 hours. Job B pays £67.50\pounds 67.50 for 55 hours. Which has the higher hourly rate, and by how much? Non-calculator.

Plan. Divide each payment by its own number of hours, then compare.

52÷4=13A: pounds per hour67.50÷5=13.50B: pounds per hour13.50−13=0.50difference per hour\begin{aligned} 52\div4&=13 &&\text{A: pounds per hour}\\ 67.50\div5&=13.50 &&\text{B: pounds per hour}\\ 13.50-13&=0.50 &&\text{difference per hour} \end{aligned}

Why not compare 5252 with 67.5067.50 directly? They pay for different amounts of time.

Answer. Job B pays £0.50\pounds 0.50 more per hour.

Check. At A's rate, five hours pays 5×13=655\times13=65, which is £2.50\pounds 2.50 less than B over five hours.

Change the measured quantity from hours to kilograms. The same divide-to-one-unit method compares prices, but now the lower rate is better value.

Worked example 4: comparing prices per kilogram

Question. Rice A costs £2.40\pounds 2.40 for 0.8 kg0.8\,\mathrm{kg}. Rice B costs £3.75\pounds 3.75 for 1.5 kg1.5\,\mathrm{kg}. Which has the lower price per kilogram, and by how much? Non-calculator.

Plan. Divide each price by its mass in kilograms.

2.40÷0.8=24÷8=3A: pounds per kilogram3.75÷1.5=7.50÷3=2.50B: pounds per kilogram3−2.50=0.50difference per kilogram\begin{aligned} 2.40\div0.8&=24\div8=3 &&\text{A: pounds per kilogram}\\ 3.75\div1.5&=7.50\div3=2.50 &&\text{B: pounds per kilogram}\\ 3-2.50&=0.50 &&\text{difference per kilogram} \end{aligned}

Why use kilograms for both? The rates must refer to the same amount before their numbers can be compared.

Answer. Rice B costs £0.50\pounds 0.50 less per kilogram.

Check. At A's rate, 1.5 kg1.5\,\mathrm{kg} would cost 1.5×3=£4.501.5\times3=\pounds 4.50, more than B's £3.75\pounds 3.75.

Rates can be multiplied back by a new amount: 3.53.5 hours at £13\pounds 13 per hour earns £45.50\pounds 45.50. Keep hours and minutes distinct; 33 hours 3030 minutes is 3.53.5 hours, not 3.303.30.

Watch out

Wrong: compare £2.40\pounds 2.40 per 800 g800\,\mathrm{g} with £3.75\pounds 3.75 per 1.5 kg1.5\,\mathrm{kg} by dividing by 800800 and 1.51.5 and comparing the results. One rate would be pounds per gram and the other pounds per kilogram. Right: convert the quantities to matching units first.

A new pair of packs uses grams for one quantity. R1's conversion is the first step.

Continue this lesson.

You’re previewing NovaLearn without an account. Create a free account to read the rest.