9GE0/03 - Players, power and connected geographical systems

9GE0/03 - Players, power and connected geographical systems

Learn how unequal influence over a connected water, energy and trading system shapes decisions, and use evidence to explain why the people most affected may have little control.

Players and decision rights

A geographical decision involves people who can authorise it, people who can make it happen and people who experience its consequences. These groups overlap, but they are rarely identical.

Player

An individual, group or organisation involved in a geographical issue through decisions, resources, influence or exposure to its effects.

Consider the Kora basin, a fictional transboundary river used throughout this lesson. The river flows from the uplands of Arun into Belen, where farms and towns depend on its dry-season flow. Arun proposes a reservoir and hydropower station. A transnational metal producer, NexMet, offers to buy much of the electricity for an export plant. An international development bank offers part of the finance. All names, quantities and positions are original illustrative material, rather than evidence about real countries.

This one issue connects compulsory Topic 5, water insecurity; Topic 6, energy security and the carbon cycle; Topic 3, global production networks; and Topic 7, economic and political influence. The reservoir stores water, the power contract moves money, the export network moves goods, and diplomatic negotiations influence whose interests enter the operating rules.

PlayerRole in the Kora decisionWhat it cannot decide alone
Arun's national governmentAuthorises the project and negotiates international agreementsWhether foreign buyers continue purchasing exports
District governmentPlans local services and relocation arrangementsThe national electricity export contract
NexMet, a TNCOffers investment and a long-term electricity purchaseThe river's future rainfall and runoff
Development bank, an IGOOffers a loan subject to conditionsEveryday reservoir releases unless its agreement gives it that role
Belen's governmentNegotiates downstream water needsOperation of a reservoir outside its territory
Local small firms and householdsSupply work, use water and bear local changesProject approval without access to decision-making institutions
Farmers' association and environmental NGOOrganise representation, evidence and pressureBinding rules merely by issuing a statement

Identify a player's actual decision right, rather than inferring power from its name. An NGO may be consulted without holding a veto. A bank may require monitoring as a loan condition without operating the dam. Someone living beside the river is a stakeholder even if excluded from the formal consultation.

Unequal sources of influence

Influence depends on what a player controls and how easily other players can replace that contribution.

Legal authority allows Arun's government to grant permits. Finance gives the bank leverage because the project cannot proceed without funds. NexMet's purchase contract makes future revenue more predictable, helping the developer obtain a loan. If NexMet can choose another country while Arun has few alternative buyers, its bargaining position strengthens. This is the connection between globalisation and unequal influence: mobility can give a company choices that a river-dependent community lacks.

Knowledge, access and legitimacy also matter. Engineers can influence the definition of a safe operating limit; residents may know which wells fail first in drought. A community with little money may gain influence by organising a coalition, supplying credible evidence or obtaining a legal hearing. Its influence becomes effective only through a mechanism, such as a changed licence or public pressure that alters a minister's political incentives.

In the illustrative financing plan, the development bank supplies 45% of project finance, Arun supplies 35% and private investors supply 20%. The bank requires an independent downstream-flow audit before each loan instalment. A village consultation has no binding power. The village may be more exposed to water loss, but the bank can delay construction by withholding funds. Exposure and influence therefore need separate analysis.

Power is relational and can change. A drought may make downstream cooperation more urgent. A national election may increase the importance of displaced voters. A buyer's dependence on an already-built plant may reduce its ability to threaten withdrawal. Do not assume that the original balance lasts throughout construction and operation.

Linked systems and causal chains

A decision in one system changes conditions in another through identifiable flows and processes.

If Arun stores more wet-season flow, the timing of downstream discharge changes. Releases through turbines can generate electricity and still send water downstream: hydropower does not automatically consume all the water it uses. Filling the reservoir, evaporation and the timing of releases can nevertheless alter downstream availability. The question is how the project operates, not simply whether a dam exists.

Continue this lesson.

You’re previewing NovaLearn without an account. Create a free account to read the rest.

Create free account